M R S Tiling Contractors Ltd undertake commercial works for councils, holiday parks, swimming pools, sporting arenas, medical centers, hospitals and many more. We are committed to providing client satisfaction and can provide references on request for previous works done.

Recent Completed Contract Summary

Warren Farm
Following on from the successful completion of the previous 3 phase renovation scheme to Warren Farm, we have returned for the 4th year to complete the most ambitious expansion plan to date.

The project included over 1400m² of wall and floor tiling and took 2 months to complete. The Vanity islands form the focus point of the entire development in both the male and female toilets.

The Alma Tavern
Phelan Construction Ltd was awarded the contract by Youngs Brewers to convert the existing Public House into a 25 bedroom hotel including new dining room and function room. We were appointed Tilers London for the above project in September 2010.

The tiling was designed to the highest standard by Jon O'Dwyer of RDD Plc winner of the European Hotel Design Awards 2009. The tiling works were completed likewise to the highest standard within 8 weeks which included 8 variations of bedroom tiling, the dining room, function room, tavern entrance, and more.

Queens Road Primary School
MRS Tiling was awarded the tiling works for the above in November 2010 by Bouygues UK Ltd, who are the second largest construction company in the world, and operate a very robust HSQE procedure. Partly because of our demonstrable commitment to HSQE we were awarded the contract. The works were completed as and when required by Bouygues UK. MR Tiling are flexible enough to resource projects at short notice when required including ramping down resources when required.

BUPA Care Home – Manor Court
The tiling works was awarded by PEC Shop Fitters and Builders Ltd in August 2010 as part of the refurbishment project of the care home. The works were phased over 3 months. We carried at the works as and when required at short notice until completion of the works.

Tescos – Southall
We undertook tiling works for Dartmouth General Contractors Ltd in September 2010. We replaced tiles in all the WCs as well as carried out tiles installation in the back of house bakery section. The works were completed within 4 weeks.

Hanger Lane Bridge
Following on from a through pre-qualification process and tender, MRS Tiling London carried out tiling as part of the Hanger Lane Bridge redevelopment project for Vinci Construction UK Ltd part of the world's largest construction group.

Moscow
2013 we carried out the tiling project for one of our clients in London

Royal Albert Hall
In 2012/2013 we carried out the project of tiling and replacing the tiles in many different areas

Kew Palace
In 2013 we carried out the project of tiling for FWA Group (Fairhurst Ward Abbots Ltd)

Venesuela Embassy
In 2013 we undertook project for FWA Group to tiles fitters 50m2 of floor tiles

Westway Services
In 2014 we carried out various projects for Westway Services Ltd

Tower of London
In 2014 we carried out another project for FWA Group (Fairhurst Ward Abbots Ltd)